Home › Compliance
Paperwork, in plain terms

Compliance overview

Compliance on a stainless countertop is mostly two questions: what is the material, and is it safe to put food on. Everything else is a national variation. This page says what each market asks for, and exactly which documents an order can carry.

MATERIALmill certificate
FOOD CONTACTEU / US / AU
MARKINGCE not applicable
DOCSconfirmed per order
Two white plates standing in a recess cut into a stainless deck, a slotted channel to the left, and a sink holding tomatoes at the top right with a tap above it.
A recess cut into the deck with a folded edge all the way round, and no sealant line along it. That is what an inspector looks for: a junction that can be cleaned rather than covered.

01What an order can carry

Documents are agreed on the quotation, not discovered at the port. These are the ones that exist; ask for the set you need and it is written into the quote.

Document set
DocumentWhat it provesTypical availability
Mill certificateAlloy and heat number of the plateFrom the mill, with the heat number
Inspection sheetMeasured dimensions and edge toleranceProduced by us, per part
Packing listParts, quantities, weightsProduced by us
Declaration of conformity, food contactMaterial suitability for food useConfirmed on the quotation
Material safety data sheetHandling and processingOn request

What we do not produce: a CE mark for a countertop. A CE mark applies to products under a specific directive or regulation — construction products, machinery, pressure equipment. A fabricated countertop is not one of them, and a supplier who offers a “CE certificate” for a worktop is selling you a piece of paper with no regulation behind it.

02What each market actually asks

Compliance requirements for three export markets: EU and UK, Australia and New Zealand, and US and Canada.THREE MARKETS, THREE DIFFERENT FIRST QUESTIONSEU / UKFood contact declaration1935/2004 + 2023/2006CE / UKCA only if a machineAustralia / NZAS/NZS food contactImport permit per productTimber packing: ISPM 15US / CanadaFDA food contactNo CE mark existsSection 301 dutiesNone of these are certificates we can print for you. Each one is a document that has tomatch your product, your market and the year you import — which is why we ask where it is goingbefore we quote, and why the answer is sometimes “ask your customs broker”.
Fig. 1 — Three markets, three different first questions. None of them is a certificate we can print for you.
By market
MarketInstrumentWhat it means for the top
European Union1935/2004 framework, 2023/2006 GMPMaterial must not transfer constituents in unsafe quantities; documentation expected
United KingdomAssimilated 1935/2004Same requirement, separate instrument
United StatesFDA 21 CFR indirect additivesStainless is generally accepted; coatings and adhesives need checking
Australia / NZFood Standards Code (FSANZ)Surfaces smooth, impervious, cleanable — a design requirement
GermanyLFGBStricter migration testing in some categories

None of these certify a countertop. They set requirements on the material and on the surfaces, and the buyer is expected to hold evidence. That evidence is the mill certificate and a declaration — which is why those two documents matter more than any logo on a page.

The detail per market: EU and UK · Australia and New Zealand.

03What we cannot tell you

We are a fabricator, not a customs broker and not a notified body. Three things are therefore outside what we will put in writing:

  • Your import duty and tariff classification. Our invoice states the goods accurately; the classification applied at your border is your customs entry, and it is worth getting professional advice on.
  • Whether your specific installation complies with your local code. Building codes govern installation, not fabrication.
  • Migration test results for your conditions. We can supply the material certificate; the test, if your market requires one on the finished article, is arranged on your side.
Ask early

Compliance requests that arrive after the parts are packed are expensive. Tell us on the enquiry which documents your customer needs, and the quote lists them.

04The material facts behind the paperwork

Every document on this site traces back to four facts about the plate, and it is worth knowing them because they are what an auditor will ask you for second, after the certificate.

What the documents actually record
FactValue we work toWhere it appears
Grade304 (1.4301) or 316L (1.4404)Mill certificate, heat number
Thickness5 / 6 / 8 / 10 mmInspection sheet, packing list
Edge tolerance±0.05 mm, machined edgeInspection sheet
SurfaceNo.4 brushed, grain along lengthDrawing and packing mark

Those four are also the four things that change the price, so a document set and a quotation should agree with each other. If a certificate says 316L and the invoice prices 304, one of them is wrong and the buyer carries the consequence at the border.

The fabrication steps are in scope too, not just the plate. We cut, machine, fold, weld, grain and passivate, and we inspect and pack in the same building — which matters because 2023/2006 puts the processes under GMP, and a fabricator who cannot say where a weld was dressed cannot honestly sign a declaration about it.

On timing: documents are confirmed on the quotation, not assembled after the fact, and they travel with the packing list. Our lead time is 15 working days from a confirmed drawing, and if a specific declaration has to be worded for your market, that wording is agreed before the plate is cut rather than after it is packed.

EU and UK detail · Australia and NZ detail · Warranty limits

05Related

Order terms · Warranty and its limits · How to judge a supplier · Request a quote

One material. One factory. One less thing to worry about.
Send your drawingTechnical data