Home › Commercial countertops
Restaurants · hotels · canteens · labs

Commercial stainless steel countertops

A commercial top is not a domestic top in a bigger kitchen. It is loaded, cleaned with chemicals, inspected with a torch and replaced on a schedule. What follows is how the four commercial types differ in the drawing, and where the money actually goes.

ALLOY304 / 316L
PLATE6 / 8 / 10 mm
JOINTSwelded, dressed flush
LEAD TIME15 days

01The four commercial types

Almost every commercial enquiry lands in one of these four. They differ mainly in what the edge and the underside have to do.

Commercial types
TypeWhat it has to doTypical plateDetail that matters
Pass counterTake plated food, hot pans, constant wiping8–10 mmFront edge comfort for staff leaning on it
Prep benchChopping, trays, impact6–8 mmUnderside bracing and leg fixing positions
Bar topLiquids, glassware, elbows8–10 mmSpill containment at the back edge
Service / wash areaWater, chemicals, sanitising6–8 mmWelded joints, no silicone bead

Thickness in commercial work is about impact and span, not about looks. A 6 mm top on legs at 1200 mm centres will ring under a dropped tray; the same plate on a braced frame at 800 mm centres will not.

02The other commercial job: fitted pantry runs

Not every commercial enquiry is a pass counter. The larger volume in most export markets is the office floor: a run of units per floor, a sink, a cooler, a place to put a cup. It is quoted by the wall rather than by the unit, and the failures are different from a kitchen's — not hygiene write-ups, but services that were not drawn and panels that were cut to fit on site.

A brushed stainless deck with a double bowl set into it, a wire basket of fruit standing in the larger bowl, an arc tap at the back, and a dark wall behind.
A welded bowl in use on the stand, with a basket standing in it. Commercial work is not only pass counters: an office floor is fitted by the hundred, and the sink end is where those runs go wrong first because a clipped-in bowl works loose long before a welded one does.
A stainless island deck from above: a slotted drain channel running into a sink with vegetables in it, a round prep bowl, stemware hanging from a rail, an induction hob at the right and a timber section at the top.
A fitted run planned around what stands on it: drain channel, sink, prep bowl and hob set out along one deck. In a pantry run the sink end is the part that has to be drawn first, because everything else gets positioned relative to it.

Both frames are ours and both are from our stand, which is worth saying plainly rather than letting the photographs imply a reference job we did not do. Neither is a plate pass counter; what they show is the part that carries over to commercial work of any size — a bowl that will not work loose, and a deck that was set out around the functions standing on it rather than cut to fit afterwards.

On a commercial job this is where the variation order comes from. If the cooler, the filter and the hydrant are not on the drawing, they get cut in during the fit-out, and the cost of that lands on whoever is holding the programme. We would rather price the voids than argue about them later; the project photographs page shows the same wall open and closed, which is what a drawn void looks like once it is built.

03Hygiene is a joint problem, not a material problem

Every food-safety framework in our markets — EU 852/2004, FSANZ in Australia and New Zealand, most US state codes — asks roughly the same thing: surfaces smooth, impervious, non-toxic, and able to be cleaned. Solid stainless plate satisfies that on its own. What fails inspection is where two surfaces meet.

  • Wall junction. A folded upstand welded or sealed with a coved fillet beats a flat top butted to a wall with a bead of silicone.
  • Top-to-top joints. Welded and dressed flush is cleanable; a butt joint with a gasket is a bacterial line and a torch will find it.
  • Leg and frame fixings. Any fastener that penetrates the top has to be sealed or avoided; bolts through the surface are the classic write-up.
  • Corners. Internal corners need a radius, not a welded right angle. Dirt sits in a sharp internal corner no matter how well it is welded.
Draw the joints, not just the outline

Send the plan with the joints marked — wall, top-to-top, upstand — and we will price the welded version against the sealed version so you can see what the hygiene detail costs before you commit.

04304 or 316L — decided by what touches the top

Most commercial kitchens are 304 and stay 304 for twenty years. 316L appears where chlorides concentrate: heavy sanitiser use, brine, dairy, seafood, laboratories, and coastal sites where the air itself carries salt.

Choosing between the two
ExposureGradeWhy
General kitchen, cooked food304Adequate PREN for normal cleaning
Brine, seafood, dairy, high sanitiser316LMolybdenum resists chloride pitting
Laboratory, chemical316LWider chemical resistance
Coastal, salt air316LPitting at scratches is the failure mode on 304
Budget fit-out, dry area304316L adds cost without adding life

PREN — pitting resistance equivalent number — is the number behind that table: %Cr + 3.3×%Mo + 16×%N. Typical 304 lands near 19, typical 316L near 24. That gap is what you are buying. We cut 304 as standard and 316L on request, with price and lead time confirmed on the quote.

05Load, span and why the top rings

A countertop deflects. The question is by how much, and whether anyone notices. For a uniformly distributed load, deflection goes with the fourth power of the span — double the span between supports and the same plate sags sixteen times as far.

Deflection, 600 mm wide top, 100 kg/m² distributed
Plate600 mm span900 mm span1200 mm span
5 mm0.4 mm1.4 mm3.3 mm
6 mm0.2 mm0.8 mm1.9 mm
8 mm0.1 mm0.3 mm0.8 mm
10 mm0.05 mm0.2 mm0.4 mm

Indicative values for a simply supported strip at 200 GPa; use them to see the shape of the problem, not as a design calculation. The practical reading: under about 1 mm nobody notices, over about 2 mm the top starts to feel soft and liquids pool. If your span is long, the cheaper fix is a brace at mid-span, not a thicker plate.

06What a commercial quote needs

Commercial jobs are quoted from a schedule more often than from a drawing, which is fine as long as the schedule carries the four things that change the price: plate thickness, edge detail, joint method, and whether legs or a frame are in scope.

Tell us also whether the site is going to be inspected under a named standard, and whether the installer needs the tops in one piece or is happy to joint on site. Those two answers change the build more than the colour of anything.

Send a drawing or schedule · Industrial and lab benches · Sink joints

One material. One factory. One less thing to worry about.
Send your drawingTechnical data